What we do

Cut your bill up to 90%. Installed in 3 to 5 days.

Residential homes, commercial buildings, agricultural farms — we design, install, file the subsidy for and maintain every solar system we put on your roof. Falak Enterprise built its first Bhopal system in 2017; since then we have installed 68 systems totalling 278 kW across MP as an MPMKVVCL-empanelled installer, with most jobs finished in 3–5 days once the permit clears.

Rooftop solar plant on a commercial shed

Our services

Everything solar, under one roof.

From 2 kW home systems to 1 MW commercial plants, Falak Enterprise handles design, installation, paperwork and ongoing support — one team from site survey to AMC.

Residential solar

Grid-tied rooftop systems for homes, 2 kW to 20 kW. PM Surya Ghar subsidy of up to ₹78,000 handled for you, with payback in 3–4 years after subsidy.

  • Free site survey and savings estimate
  • Subsidy application handled end to end
  • Net metering setup with MPMKVVCL
  • 25-year panel warranty, 5-year workmanship
Home plans & pricing — Residential solar

Commercial solar

Systems for offices, factories, hospitals and malls, 10 kW to 1 MW. Accelerated depreciation benefits available for businesses.

  • 40% accelerated depreciation in year one
  • CAPEX and OPEX financing models
  • Commercial net metering with HT connection
  • Real-time SCADA-grade monitoring
See the ROI math — Commercial solar

Agricultural solar

Solar pumping for farmers — replace diesel pumps, cut irrigation costs by up to 90% and access PM-KUSUM subsidies of up to 60%.

  • PM-KUSUM Component B subsidy
  • 2 HP to 10 HP solar pump systems
  • Drip and sprinkler integration available
  • Works without a grid connection
Get a free estimate — Agricultural solar

Off-grid + battery

For locations without reliable grid access — lithium battery storage paired with solar for round-the-clock power independence.

  • LiFePO4 lithium battery banks
  • Hybrid inverter with grid backup
  • Suits remote homes and towers
  • Backup sized to your essential loads
Do you need a battery? — Off-grid + battery

Net metering setup

Export your surplus units to the MP DISCOM grid for bill credit. We handle the bidirectional meter application, DISCOM inspection and agreement — zero paperwork for you.

  • Application and liaison with MPMKVVCL
  • Full document preparation
  • Inspection attended on your behalf
  • Typically done within 30–45 days
How net metering works — Net metering setup

AMC & maintenance

Annual maintenance that keeps your system at peak output — cleaning, inverter and wiring checks and performance reporting, at one flat ₹2 per watt per year.

  • Panel cleaning on a seasonal schedule
  • Inverter, wiring and earthing checks
  • Priority breakdown response
  • Monthly performance report on WhatsApp
AMC at ₹2 per watt — AMC & maintenance

What you’re actually buying

What each stage involves.

“Turnkey” gets used loosely, so here is exactly what we do at each step — and what you do, which is almost nothing.

  1. Site survey

    An engineer comes to the property — usually within the same week — and does the real work of sizing. We measure the shadow-free roof area, note the roof type (RCC, tin or tile changes the mounting structure, not the panels), check for shading from water tanks, parapets and trees through the day, and read your sanctioned load and last few bills. You get an honest system size out of this, not a sales number pulled to fit a target.

  2. Design & quote

    From the survey we produce a panel layout, a single-line electrical diagram, the inverter and structure specification, and a generation estimate for your specific roof at Bhopal’s ~5.2 peak sun hours. The quote is exact and itemised — you see what the structure, panels, inverter and DISCOM work each cost, not one lump figure.

  3. Liaison & paperwork

    This is the part people dread and the part we take off your plate. For homes we register the PM Surya Ghar application on the national portal and file the technical feasibility request with MPMKVVCL; for businesses we handle the load sanction and, where a plant needs it, CEIG approval and HT metering coordination. You sign where required and we chase the approvals.

  4. Installation

    Most systems go up in 3–5 days once the permit clears. The mounting structure is anchored first, then tier-1 panels are strung and wired through the inverter to your board with proper earthing and lightning protection. Cable runs are clipped and routed, not left loose. Your power is cut only for a short, planned window during the board tie-in, and we clean the site before we leave.

  5. Net metering & commissioning

    We apply for the bidirectional meter, prepare every document and attend the DISCOM inspection on your behalf — you do not need to take a day off for it. Once the net meter is installed and the system is commissioned, exported units start earning credit on your bill, and for homes we file the commissioning report and bank details that release the subsidy by direct transfer. Net-metering setup typically adds 30–45 days after installation.

  6. AMC & monitoring

    After go-live the system needs little, but not nothing. Dust in MP can cost 10–15% of output if panels are left dirty, so cleaning twice a year matters, and the inverter and wiring want a periodic check. Our AMC covers cleaning, inspections and priority response, and daily remote monitoring flags any drop in generation before it would ever show up on your bill.

Government scheme

PM Surya Ghar: free electricity scheme.

India’s largest residential solar subsidy programme. Get up to ₹78,000 off your installation cost — we handle the entire application, you just enjoy the savings.

Open to every residential connection in Madhya Pradesh until 31 March 2027. We file and clear PM Surya Ghar applications for homes across Bhopal and the surrounding districts — the portal work is ours, start to finish.

1 kW to 2 kW system

1 kW
₹30,000
2 kW
₹60,000

3 kW system and above

₹78,000

Flat subsidy — the maximum available, regardless of system size beyond 3 kW.

Who qualifies

Any Indian citizen with a residential electricity connection. One application per household; Aadhaar and an electricity bill are required.

How it works

Your solar journey, step by step.

01

Free consultation

Call or WhatsApp. We understand your needs and do a quick savings estimate.

+91 89890 03670

02

Site survey

An engineer visits, measures your roof, checks shading and designs the optimal system.

Same-week visit in Bhopal

03

Permit + subsidy

We file all DISCOM and PM Surya Ghar paperwork. You sign once.

You sign, we chase

04

Installation

3–5 day install by our certified team. Minimal disruption, clean site always.

3–5 days on the roof

05

Go live + monitor

The system switches on and your portal access is activated. Track your generation for good.

Lifetime portal access

Common questions

Frequently asked questions

How much does a residential solar system cost in Bhopal?

A 3 kW home system is ₹2,00,000 turnkey including GST; after the ₹78,000 PM Surya Ghar subsidy you pay ₹1,22,000. In Bhopal it generates about 4,200 units a year — typically the full consumption of a 3-BHK home. Model your own bill in the savings calculator.

How long does installation take?

Site survey to installation is typically 2–3 weeks, including 1–2 weeks for permit and subsidy filing. The physical installation takes 3–5 days depending on system size. Net metering setup with the DISCOM adds another 30–45 days after installation.

What is the payback period for solar in MP?

For homes, payback after the PM Surya Ghar subsidy is typically 3–4 years. Commercial systems do not get that subsidy, but higher tariffs and 40% accelerated depreciation bring their payback to roughly 3–4 years as well. Bhopal receives about 5.2 peak sun hours a day, and with MP tariffs around ₹7.50 per unit the return over 25 years is 300–400%.

Does solar work during Bhopal summers and monsoons?

Yes. Bhopal’s summers (March–June) are the highest-generation months. The monsoon (July–September) reduces generation by 30–40%, but panels still produce on cloudy days. Across the year a system averages about 4 units per kW per day — roughly 1,400 units per kW annually.

What happens to excess power my system generates?

With net metering, excess power flows to the DISCOM grid and you receive a credit on your bill. At the end of each billing cycle you pay only for the net units consumed. Credits carry forward and can bring your bills to near zero.

What maintenance does a solar system need?

Very little. Panel cleaning twice a year is the main task — dust in MP can cut output by 10–15% if panels are left dirty. Inverters need a visual check every six months. Our AMC covers all of this at a flat ₹2 per watt per year. There are no moving parts, so major repairs are uncommon within the first 15 years.

Which solar panel brands do you install?

We work with tier-1 MNRE-approved manufacturers — Waaree, Adani Solar, RenewSys and Vikram Solar. For inverters we install Solis, Growatt and SMA. All products carry manufacturer warranties and are BIS-certified, and we recommend the best option for your requirements.

One team for survey, subsidy, install and AMC.

You deal with us for the whole thing — no chasing separate vendors for panels, paperwork and maintenance. Book a free site visit and our engineer will size the system and give you a savings figure to the rupee. MPMKVVCL-empanelled, 68 systems and 278 kW across MP since 2017.

Or call +91 89890 03670 · Mon–Sat, 9 AM – 7 PM