By Gagan Sharma, Founder, Falak Enterprise
B.Tech (Civil), MANIT Bhopal · Solar EPC since 2017 · MPMKVVCL-empanelled installer
Last updated: 21-07-2026
PM Surya Ghar: Muft Bijli Yojana is India's national rooftop solar subsidy scheme, and it's the single biggest reason solar has become affordable for homeowners in Bhopal and across Madhya Pradesh. But the scheme's rules are easy to get wrong — and installers sometimes quote numbers that don't match what the government actually pays. Here's the plain version, with the exact subsidy tiers, the documents you need, worked cost examples for common system sizes, and the mistakes that hold applications up.
How much is the subsidy, exactly?
The subsidy is tiered by system size, not a flat percentage of cost. For a residential rooftop system in Madhya Pradesh:
| System size | Subsidy amount |
|---|---|
| 1 kW | ₹30,000 |
| 2 kW | ₹60,000 |
| 3 kW or larger | ₹78,000 (flat maximum) |
₹78,000 is the ceiling. A 5kW or 10kW system does not get a larger subsidy than a 3kW system — the ₹78,000 cap applies to any system 3kW and above. The official amounts are published on the PM Surya Ghar national portal, so if an installer quotes you a subsidy figure above ₹78,000 for a residential system, treat that as a red flag.
Who qualifies?
- Any Indian citizen with a residential electricity connection in Madhya Pradesh
- One application per household
- The applicant's name should match the electricity connection holder
- A roof with clear ownership or written authorisation to install
Commercial and industrial properties are not eligible for PM Surya Ghar — it's a residential-only scheme. Commercial solar in MP instead benefits from accelerated depreciation and net metering, which is a different economic case entirely; if that's your situation, our commercial solar page covers it.
Documents you need to apply
Applications through the national portal move fastest when every document is ready before you start. Keep these to hand: your Aadhaar card for identity and portal login, a recent electricity bill (it carries your consumer number, sanctioned load, and DISCOM — in Bhopal and central MP that's MPMKVVCL), proof of roof ownership or a written authorisation letter if the property isn't in your name, a cancelled cheque or bank passbook for the account the subsidy is credited to, and a passport-size photograph. Your installer adds the technical set — system specifications, panel and inverter datasheets, and, after commissioning, the installation report the DISCOM needs before it releases the subsidy. Scanned copies on your phone let you clear any portal query the same day rather than restarting the queue.
How you actually apply, start to finish
The process runs through the national portal, and knowing the order saves you chasing the wrong person at the wrong time. You register on the PM Surya Ghar portal with your state, DISCOM (MPMKVVCL for Bhopal and central MP), and consumer number, then apply for feasibility approval. Once the DISCOM clears feasibility, you get your system installed by a registered vendor — this is where a good installer does the heavy lifting. After installation, the vendor submits the plant details and you apply for net metering; the DISCOM inspects and fits the bidirectional meter. When that's commissioned and the report is uploaded, you submit your bank details on the portal, and the subsidy is credited directly to that account. The one part you can't shortcut is that the money comes at the end — after commissioning — not at booking. Anyone reordering those steps to collect the subsidy from you early has left the actual process behind.
How long does it actually take?
This is where most confusion — and most installer over-promising — happens. A realistic timeline looks like:
- Registration & DISCOM approval: 1-2 weeks
- Physical installation: 3-5 days once approved
- Net metering setup with the DISCOM: an additional 30-45 days after installation
End to end, budget for 4-8 weeks from application to a fully net-metered, subsidy-approved system. Be skeptical of anyone promising subsidy money in your bank account within days — the disbursal process runs through the DISCOM and the national portal, not the installer.
Worked cost examples: 2 kW, 3 kW, 5 kW
The subsidy changes the maths differently at each size, so here's how three common home systems pencil out. Generation assumes Bhopal's roughly 5.2 peak sun hours a day, and savings use MP's residential tariff of about ₹7.50 per unit at the higher slabs solar knocks out first.
| System | Subsidy | Units/month | Saving/month |
|---|---|---|---|
| 2 kW | ₹60,000 | ~240-270 | ~₹2,300-₹3,000 |
| 3 kW | ₹78,000 | ~360-400 | ~₹3,500-₹4,500 |
| 5 kW | ₹78,000 (capped) | ~600-680 | ~₹5,500-₹7,000 |
Watch what the cap does. At 2 kW you get ₹30,000 per kW of help; at 3 kW you still get the full ₹78,000; but a 5 kW system draws the same ₹78,000 — the extra 2 kW gets nothing from the scheme. So 3 kW is the sweet spot if your roof and bill are modest. Go to 5 kW only when your usage genuinely needs it, because those extra units are worth far more in saved bills than the flat subsidy would have added. For a 3 kW system at ₹1,35,000-₹1,50,000 gross, the ₹78,000 brings you to roughly ₹57,000-₹72,000 net — that's where the 3-4 year payback comes from.
Why your units are worth more than you think: A 3 kW rooftop in Bhopal makes about 360-400 units a month. Solar cancels your most expensive units first — and MP residential tariffs climb past ₹7.50 a unit at the higher slabs, before fixed charges. So those units are worth ₹3,500-₹4,500 a month to a normal household, not the ₹2 or ₹3 you'd guess from your average rate. The bigger your bill now, the faster this pays back.
Where applications actually get stuck
Most delays aren't the subsidy — they're avoidable slips. The connection is in a parent's or previous owner's name, so the applicant and the billed party don't match and the portal rejects it. The sanctioned load on the bill is lower than the system size, which triggers a load-enhancement step with MPMKVVCL before net metering can go ahead. People also treat the subsidy and net metering as one approval — they aren't; the money comes after commissioning and a separate meter step. Fix the name and load mismatch before you apply and you skip the two delays that cost people the most weeks.
About Falak Enterprise: We file the PM Surya Ghar application ourselves for every home we do — and we've done 68 systems, 278 kW, since 2017 as an MPMKVVCL-empanelled installer. We check the connection name and sanctioned load before applying, so your file doesn't bounce back on day one. If you want the whole picture, our residential solar page walks through sizing, install, and net metering together.
Frequently Asked Questions
How much is the PM Surya Ghar subsidy?
₹30,000 for a 1kW system, ₹60,000 for a 2kW system, and a flat ₹78,000 for any system 3kW or larger. ₹78,000 is the maximum subsidy available — a bigger system does not get a bigger subsidy beyond 3kW.
Who is eligible for PM Surya Ghar in Bhopal?
Any Indian citizen with a residential electricity connection in Madhya Pradesh. One application per household. You need Aadhaar and a recent electricity bill to apply.
How long does the application take?
Realistically 4-8 weeks end to end: registration and DISCOM approval typically take 1-2 weeks, installation itself takes 3-5 days once approved, and net metering setup with the DISCOM after installation takes another 30-45 days.
Does the subsidy apply to commercial installations?
No. PM Surya Ghar is a residential-rooftop-only scheme. Commercial and industrial solar in Madhya Pradesh does not receive this capital subsidy, though it benefits from accelerated depreciation and net metering instead.
Want to know your exact eligibility and savings?
Get a free site survey for your home — our engineer checks your roof, sizes your system, and files your subsidy application for you.
See Residential Solar Book Free Site Visit